- I’m constantly arguing for more slack in the system. Too many managers treat knowledge work like it’s a factory.
I ran a team for about a year and was constantly pushing them to do less. The team were the ones trying to pile on more work, a force of habit I think.
I noticed that when we planned less, people finished faster (probably due to greater focus and a quick finish in sight), then they pulled more into the sprint and ended up getting more done. We actually went faster when we tried to do less. I’m hoping that being told to slow down all the time meant it wasn’t actually stressful for them either. I always wanted to have slack in the system so we weren’t having to perform heroics and pull all-nighters to meet arbitrary deadlines. If something came up, we could fit it in, because we weren’t overloading ourselves. And when nothing came up, we flew.
I stepped back into an IC role, as I didn’t really enjoy running things. The person who took over was skeptical of how I had done things, but was told to try going with it, since we had been so successful. Overtime there was some regression. After a couple more management changes, we are the polar opposite. Everyone is stressed and it seems like very little actually gets done, because everyone is stretched so thin on too many projects at once. Everyone looks really busy though, I guess that’s all that matters anymore.
by austin-cheney
0 subcomment
- Yes, I completely agree but it’s not as dire as it sounds. The people most capable of thinking will create their own gaps as necessary to continue thinking, which is inefficient but it’s also a preference. The more busy these people become the more they will work to drive that thinking time and that friction is the basis of innovation. That value is logarithmic.
For everyone else you need to occupy their time with tasks as much as possible because their value is linear.
- The trade off between utilization and latency is rarely understood in organizations. Little’s law should be mandatory (management) reading. Unused capacity is not waste, but buffers that absorb variability, and thus keeps latency down.
by repelsteeltje
2 subcomments
- Yes, it's sad.
For a couple of years I helped develop scheduling software for supply chains in process industry. We frequently optimized for throughput or resource utilization, but also for just in time or minimal latency. So goals differ, but it kind of works in industrial context.
Now, there has always been a tendency to also frame knowledge work like software development as though it's just industrial production. Hence (mostly futile) attempts to make things predictable, reproducible and "efficient". Where efficiency is bluntly taken to mean optimal utilization.
by altairprime
0 subcomment
- Yes. Resilience is an unexploited opportunity for short-term gains, and in the U.S. anyways it’s not legal for most corporations to prioritize their long-term health over the short-term gains demanded by most shareholders (thus the private equity industry).
by svilen_dobrev
0 subcomment
- there's a lot written on the topic - e.g. [1]
My ELIengineer take is that no bearing works without some slack - it gets stuck. But that still needs some understanding, and that is less and less available, esp. at management levels.
[1] https://fs.blog/slack/
- What are you talking about?
Up to 80% of a typical dev time these days (depending on the company and the project) is idle waiting for a build to fail again, deployment to finish, all teammates showing up to another useless meeting, writing stupid performance reviews, arguing about secondary yet unavoidable issues on slack and pr comments, etc etc.
- Genx here. Yes that is accurate.
- Yes, and it’s now up to us as managers to engineer that ebb and flow as part of the process. Don’t assign too much work all the time. Make sure that the employees feel excited and rewarded for their hard work (don’t just dump another pile on their desk). Make sure their work is diverse enough so they are not stuck doing the same slog all the time.
Make sure the employee sees the big picture of the company - this is how your work is contributing to our mission (the janitor at nasa isn’t sweeping the floor, he’s helping put a man on the moon). When boring work must be done tell them you know it’s boring but all of us have to shovel gravel sometimes, it’s just part of life, but there’s a bit of fun on the other side of it. Be interested in the employees - what are their personal goals over the next 12 months? Learn their dogs name, learn their hobbies, be interested in them as a human and then TRY HELP THEM get to their personal goals. If they want to get fit then block out an hour gym time and send them off to it. Encourage them to bring you new ideas, support them to try out the new ideas - if it doesn’t work out then “hey no problem” but if it does work out tell everyone in the company very publicly and make a lot of noise about it. Don’t criticise them in public, take them aside and help them be better. And lastly, is someone isn’t working out, or is causing cultural problems - get rid of them, it’s harming more than you think. Don’t micromanage - assign the work, support them and then get the hell out of the way.
Good managers will do all of this simultaneously.
Bad managers just try to cram as much work in as possible. Because they are so poor at evaluating the quality of what their employees are doing, the only thing they understand is maximise throughput at the expense of all else. If your manager is like this, leave asap